Implementation of Project No. (6): 125 kW⚡️on-grid
For a textile factory in Aleppo, First Class Industrial City
Project components:
🔴Growatt 125 kW on-grid inverter
🔴Trina 710 watt panels
In addition to:
● Preparing an electrical control panel for the system components.

● A panel equipped with full protection for the DC current coming from the panels.

● Activating the zero export system using Smart Meter.